County Roadways Ltd
Overall Trust Score · out of 100
From the average rating, number of reviews, how many platforms corroborate them, and whether the business is verified.
About
Verified driveways / patios / paths in Winchester.
Reviews
Highlights
"The company were contracted to remove an old tarmac driveway and resurface specifically to be flat and 'wheelchair friendly'. The contract was signed on 20 June with no start date specified - 'as soon as possible'. Without prior notice we had a knock at the door on 17 July to say 'we'll be here to start in the morning'. The work was quickly completed. On a quick look the work seemed satisfactory but closer inspection shows that it is by no means true and flat, is not always level with the pre-existing brick edging and has many puddles after rain. In spite of three emails we have no response"
"The company were contracted to remove an old tarmac driveway and resurface specifically to be flat and 'wheelchair friendly'. The contract was signed on 20 June with no start date specified - 'as soon as possible'. Without prior notice we had a knock at the door on 17 July to say 'we'll be here to start in the morning'. The work was quickly completed. On a quick look the work seemed satisfactory but closer inspection shows that it is by no means true and flat, is not always level with the pre-existing brick edging and has many puddles after rain. In spite of three emails we have no response"
"James came out and explained all our options. From blocks tarmac and resin. We went with blocks and sleeper retaining wall. The paperwork was completed and given a 14 day cooling off period. We were told it would be between 3 to 4 week before it could be carried out, which suited us. The entire job took 3 full days. The first and second day was preparation and removal of concrete and soil. Day 3 was the laying of the blocks and tidy up, and sealing the blocks. The lads arrived early and worked all day, and tidied up every evening. Polite and well mannered. I was informed at all stages."
Detailed reviews
Showing the 5 reviews we hold full text for. The 141 headline total is the review volume reported across County Roadways Ltd’s source profiles.
The company were contracted to remove an old tarmac driveway and resurface specifically to be flat and 'wheelchair friendly'. The contract was signed on 20 June with no start date specified - 'as soon as possible'. Without prior notice we had a knock at the door on 17 July to say 'we'll be here to start in the morning'. The work was quickly completed. On a quick look the work seemed satisfactory but closer inspection shows that it is by no means true and flat, is not always level with the pre-existing brick edging and has many puddles after rain. In spite of three emails we have no response
The company were contracted to remove an old tarmac driveway and resurface specifically to be flat and 'wheelchair friendly'. The contract was signed on 20 June with no start date specified - 'as soon as possible'. Without prior notice we had a knock at the door on 17 July to say 'we'll be here to start in the morning'. The work was quickly completed. On a quick look the work seemed satisfactory but closer inspection shows that it is by no means true and flat, is not always level with the pre-existing brick edging and has many puddles after rain. In spite of three emails we have no response
James came out and explained all our options. From blocks tarmac and resin. We went with blocks and sleeper retaining wall. The paperwork was completed and given a 14 day cooling off period. We were told it would be between 3 to 4 week before it could be carried out, which suited us. The entire job took 3 full days. The first and second day was preparation and removal of concrete and soil. Day 3 was the laying of the blocks and tidy up, and sealing the blocks. The lads arrived early and worked all day, and tidied up every evening. Polite and well mannered. I was informed at all stages.
100% delighted with the work undertaken . The result is superb and a great improvement. The team took good care to ensure they left the site clean and safe overnight. Happy to recommend to all
James came out and explained all our options. From blocks tarmac and resin. We went with blocks and sleeper retaining wall. The paperwork was completed and given a 14 day cooling off period. We were told it would be between 3 to 4 week before it could be carried out, which suited us. The entire job took 3 full days. The first and second day was preparation and removal of concrete and soil. Day 3 was the laying of the blocks and tidy up, and sealing the blocks. The lads arrived early and worked all day, and tidied up every evening. Polite and well mannered. I was informed at all stages.